Iluka Resources Limited
An extension to Iluka's Heavy Mineral Concentrate storage pad, built to support additional feedstock capacity at the Narngulu Mineral Separation Plant.

Capability
Bulk earthworks, pavements and drainage delivered end to end for government, industry and private developers.
Roads, subdivisions, ports and bulk earthworks
From black spot roundabouts in the Geraldton CBD to 29 lot subdivisions and port rock wall re-armouring. We are a Main Roads WA prequalified contractor (R2/B1) and a WALGA preferred supplier, working for State and Local Government, ports, grain handlers and private developers. Sealing, asphalt and line marking are delivered by specialist subcontractors under RDH project management.
Credentials
Scope
Clearing and grubbing, topsoil stripping, cut to fill, embankment construction, rock excavation, borrow pit management and compaction testing to specification.
Subgrade preparation, base course import and conditioning, cement and lime stabilisation, final trim, and management of sealing, asphalt and line marking subcontractors.
Stormwater drains, sumps and basins, reinforced concrete box culverts, pipe culverts, end treatments, rock pitching and grouted outlets.
Fill and level, subdivisional roads, footpaths, retaining walls, acoustic walls, bollards and signage, plus coordination of all electrical, sewer, stormwater and water in-ground services.
Runway, taxiway and apron earthworks, jet blast areas, aerodrome visual aids, perimeter fencing and drainage, delivered around live air traffic.
Rock wall repair and re-armouring to a 50 year design life, geotextile placement, armour rock sorting and reinstatement.
Recent work
An extension to Iluka's Heavy Mineral Concentrate storage pad, built to support additional feedstock capacity at the Narngulu Mineral Separation Plant.
A full airstrip build to support the rapid development of the Riverina Underground Mine and enable FIFO operations for site personnel.
Peak Planning bulkheads built to meet the 2025/26 Harvest Program, covering bulk earthworks, drainage, pavement and hardstand works.
Bulk earthworks pad, access roads, pavement layers and drainage for a temporary grain storage facility built for record harvest volumes.
A temporary grain storage facility built at Carnamah, including rock excavation, imported fill, drainage and cement stabilised pavement.
A 28 hectare site filled and levelled into a 29 lot subdivision, delivered ready for 48 homes in 22 weeks, on time and under budget.
A complete upgrade of an 8 kilometre section of mine access road, sheeted with more than 30,000 tonnes of road base.
Road rehabilitation and surfacing across four Mid West roads, with lane works staged and largely carried out at night.
Drainage, culverts, jet blast area refurbishment and taxiway repair, coordinated with air traffic control to keep the runway in normal use.
2.77km of sealed access road into the Binduli mining operations, including lime and cement stabilisation through wet areas.
A 2km section of mine access road topped up, culverted and sealed, with subcontractor management for the two coat bitumen seal.
Development of the Ruvidini site as a product staging area, with earthworks for a side tipper truck unloader, link conveyor and radial stacker.
Demolition of an existing path and earthworks for a new concrete pathway, including batter shaping and jute matting installation.
Ten additional heap leach pads, a sediment control pond and an emergency pond, delivered on a six month contract.
Shoulder widening, pavement repairs and full pavement construction on the access road to Iluka's Rare Earth Refinery Plant.
Repair and re-armouring of rock walls around the port to restore structural integrity and achieve a 50 year design life.
Shoulder improvement and sealing works on the South Western Highway, including pavement construction and seal subcontractor management.
Expansion of the Morawa CBH facility with new permanent open bulkhead storages and a Marshall Sample Weigh area.
Village pad, laydown areas, main pad and road earthworks, drainage and rip rap for the gas compressor station.
A black spot roundabout in the Geraldton CBD, brought in well ahead of schedule by closing the work area and re-routing traffic.
Three carparks built as head contractor inside a national park, with dieback and weed management critical to project success.
Trenching, backfill, road works and compaction testing across the north and south blocks of the Ellendale solar farm.
Over 70,000m3 of imported fill and 36,000m2 of subgrade preparation on a waterlogged site inside the Iluka mining lease.

Tell us the scope, the site and the window. We will come back with a programme and a price.