Capability

Civil Construction

Bulk earthworks, pavements and drainage delivered end to end for government, industry and private developers.

Roads, subdivisions, ports and bulk earthworks

What we bring to site

From black spot roundabouts in the Geraldton CBD to 29 lot subdivisions and port rock wall re-armouring. We are a Main Roads WA prequalified contractor (R2/B1) and a WALGA preferred supplier, working for State and Local Government, ports, grain handlers and private developers. Sealing, asphalt and line marking are delivered by specialist subcontractors under RDH project management.

Credentials

  • MRWA prequalified contractor (R2/B1)
  • WALGA preferred supplier
  • Member of the Civil Contractors Federation
  • ISO 9001, ISO 14001 and ISO 45001 certified

Scope

What this covers

01

Bulk earthworks

Clearing and grubbing, topsoil stripping, cut to fill, embankment construction, rock excavation, borrow pit management and compaction testing to specification.

02

Roads and pavements

Subgrade preparation, base course import and conditioning, cement and lime stabilisation, final trim, and management of sealing, asphalt and line marking subcontractors.

03

Drainage and culverts

Stormwater drains, sumps and basins, reinforced concrete box culverts, pipe culverts, end treatments, rock pitching and grouted outlets.

04

Subdivisions and land development

Fill and level, subdivisional roads, footpaths, retaining walls, acoustic walls, bollards and signage, plus coordination of all electrical, sewer, stormwater and water in-ground services.

05

Aerodromes and airstrips

Runway, taxiway and apron earthworks, jet blast areas, aerodrome visual aids, perimeter fencing and drainage, delivered around live air traffic.

06

Marine and foreshore

Rock wall repair and re-armouring to a 50 year design life, geotextile placement, armour rock sorting and reinstatement.

Recent work

Civil Construction projects

Narngulu HMC storage pad extension
CivilFebruary 2026

Iluka Resources Limited

An extension to Iluka's Heavy Mineral Concentrate storage pad, built to support additional feedstock capacity at the Narngulu Mineral Separation Plant.

Riverina aerodrome earthworks
CivilJanuary 2026

Ora Banda Mining

A full airstrip build to support the rapid development of the Riverina Underground Mine and enable FIFO operations for site personnel.

Narngulu temporary grain storage earthworks
CivilDecember 2025

CBH Group

Peak Planning bulkheads built to meet the 2025/26 Harvest Program, covering bulk earthworks, drainage, pavement and hardstand works.

Marchagee temporary grain storage earthworks
CivilNovember 2025

CBH Group

Bulk earthworks pad, access roads, pavement layers and drainage for a temporary grain storage facility built for record harvest volumes.

Carnamah temporary grain storage facility
CivilOctober 2025

CBH Group

A temporary grain storage facility built at Carnamah, including rock excavation, imported fill, drainage and cement stabilised pavement.

8km mine site access road upgrade
CivilJuly 2025

Norton Gold Fields

A complete upgrade of an 8 kilometre section of mine access road, sheeted with more than 30,000 tonnes of road base.

Aerodrome repair project
CivilJanuary 2025

Karara Mining Limited

Drainage, culverts, jet blast area refurbishment and taxiway repair, coordinated with air traffic control to keep the runway in normal use.

Binduli access road construction
CivilDecember 2024

Norton Gold Fields

2.77km of sealed access road into the Binduli mining operations, including lime and cement stabilisation through wet areas.

Shine Iron Ore Mine road access upgrade
CivilNovember 2024

Fenix Resources

A 2km section of mine access road topped up, culverted and sealed, with subcontractor management for the two coat bitumen seal.

Ruvidini Inland Port and access road
CivilNovember 2024

Fenix Resources

Development of the Ruvidini site as a product staging area, with earthworks for a side tipper truck unloader, link conveyor and radial stacker.

Binduli heap leach pads construction
CivilJune 2024

Norton Gold Fields

Ten additional heap leach pads, a sediment control pond and an emergency pond, delivered on a six month contract.

South Western Highway shoulder improvement and sealing
CivilJanuary 2024

Main Roads WA

Shoulder improvement and sealing works on the South Western Highway, including pavement construction and seal subcontractor management.

Morawa permanent grain storage facility
CivilAugust 2023

CBH Group

Expansion of the Morawa CBH facility with new permanent open bulkhead storages and a Marshall Sample Weigh area.

Ellendale Solar Farm earthworks
CivilJanuary 2020

Juwi

Trenching, backfill, road works and compaction testing across the north and south blocks of the Ellendale solar farm.

Yandin Wind Farm substation earthworks
CivilNovember 2019

Yandin Wind Farm

Over 70,000m3 of imported fill and 36,000m2 of subgrade preparation on a waterlogged site inside the Iluka mining lease.

Need a civil contractor in regional WA?

Tell us the scope, the site and the window. We will come back with a programme and a price.