Civil Construction

Rare Earth Refinery access road upgrades

Shoulder widening, pavement repairs and full pavement construction on the access road to Iluka's Rare Earth Refinery Plant.

Client
Iluka Resources Limited
Capability
Civil Construction
Completed
7 February 2024

Shoulder widening

  • Compact all fill areas to achieve embankment foundation compaction
  • Import fill and form embankments
  • Remix existing shoulder incorporating existing pavement material to nominated width, using a stabiliser, grader, roller, water carts
  • Trim and compact final surface to form final surface suitable for sealing

Existing pavement repairs

  • Profile or boxout rut area for repair
  • Clean out and apply seal, top up with asphalt and compact
  • Prepare areas for sealing

Pavement construction

  • Top up 50mm and wet mix existing pavement incorporating existing seal into pavement using stabiliser, grader, 2x rollers and 2x water cart, mixing and conditioning to a depth of 150mm
  • Testing to ensure specified compaction is achieved
  • Compacted gravel trimmed to within tolerances and rolling using a Final Trim Grader and Multi Wheel Roller to prepare surface for sealing

Asphalting and line marking

  • Management of sub-contractor

More civil work

Related projects

Narngulu HMC storage pad extension
CivilFebruary 2026

Iluka Resources Limited

An extension to Iluka's Heavy Mineral Concentrate storage pad, built to support additional feedstock capacity at the Narngulu Mineral Separation Plant.

Riverina aerodrome earthworks
CivilJanuary 2026

Ora Banda Mining

A full airstrip build to support the rapid development of the Riverina Underground Mine and enable FIFO operations for site personnel.

Narngulu temporary grain storage earthworks
CivilDecember 2025

CBH Group

Peak Planning bulkheads built to meet the 2025/26 Harvest Program, covering bulk earthworks, drainage, pavement and hardstand works.

Have something similar to price?

Send through the scope and we will get back to you with a programme and a price.