Yandin Wind Farm substation earthworks

Over 70,000m3 of imported fill and 36,000m2 of subgrade preparation on a waterlogged site inside the Iluka mining lease.

Client
Yandin Wind Farm
Capability
Civil Construction
Location
Yandin WA
Completed
November 2019

The site is located within the Iluka mining lease and was being utilised as farmland. Initially the site was covered with thick grazing pasture over a sandy surface, with much of the site inundated following a relatively wet winter. The site sloped gently down in a general westerly direction with a surface level difference of about 2m across the site. The winter groundwater level was at surface level.

Scope included

  • Site clearing
  • Facilitate the importing of over 70,000m3 of fill
  • Subgrade preparation of over 36,000m2
  • Excavate and shape swale drains and batters
  • Rock pitch batter protection
  • Install reinforced concrete box culverts
  • Over 9000m2 of bituminous surfacing
  • Full road construction
  • Traffic control associated with works

More civil work

Related projects

Narngulu HMC storage pad extension
CivilFebruary 2026

Iluka Resources Limited

An extension to Iluka's Heavy Mineral Concentrate storage pad, built to support additional feedstock capacity at the Narngulu Mineral Separation Plant.

Riverina aerodrome earthworks
CivilJanuary 2026

Ora Banda Mining

A full airstrip build to support the rapid development of the Riverina Underground Mine and enable FIFO operations for site personnel.

Narngulu temporary grain storage earthworks
CivilDecember 2025

CBH Group

Peak Planning bulkheads built to meet the 2025/26 Harvest Program, covering bulk earthworks, drainage, pavement and hardstand works.

Have something similar to price?

Send through the scope and we will get back to you with a programme and a price.