Civil Construction

8km mine site access road upgrade

A complete upgrade of an 8 kilometre section of mine access road, sheeted with more than 30,000 tonnes of road base.

Client
Norton Gold Fields
Capability
Civil Construction
Location
Kalgoorlie WA
Completed
July 2025

Improvement works to an 8km mine site access road. The project involved the complete upgrade of an 8-kilometre section of existing roadway utilising heavy earthmoving equipment.

The scope of works included the installation of drainage channels and culverts to ensure effective water management and improve long-term road performance.

The entire road alignment was sheeted with in excess of 30,000 tonnes of road base material, delivering a durable and stable surface suitable for all-weather access in and out of the mine site.

More civil work

Related projects

Narngulu HMC storage pad extension
CivilFebruary 2026

Iluka Resources Limited

An extension to Iluka's Heavy Mineral Concentrate storage pad, built to support additional feedstock capacity at the Narngulu Mineral Separation Plant.

Riverina aerodrome earthworks
CivilJanuary 2026

Ora Banda Mining

A full airstrip build to support the rapid development of the Riverina Underground Mine and enable FIFO operations for site personnel.

Narngulu temporary grain storage earthworks
CivilDecember 2025

CBH Group

Peak Planning bulkheads built to meet the 2025/26 Harvest Program, covering bulk earthworks, drainage, pavement and hardstand works.