Capability

Mining Services

Round the clock mine site services and the bulk earthworks that keep production moving.

ROM pad operations, tailings and site services

What we bring to site

We run mine site services 24 hours a day, 365 days a year, and build the infrastructure that keeps a site producing. Heap leach pads, tailings storage facilities, haul and access roads, aerodromes and remote fly camps. Our field service vehicles and mechanics travel with the fleet so production is not waiting on a breakdown.

Credentials

  • ISO 9001, ISO 14001 and ISO 45001 certified
  • MRWA Heavy Vehicle Accredited
  • Field service vehicles and mechanics on site
  • Fleet of over 300 assets

Scope

What this covers

01

ROM pad operations

Control of the ROM pad 24/7, loader operations, blend and stockpile management, oversize ore and waste handling, floor and pad maintenance, dust control and daily fuel runs.

02

Heap leach and tailings

Bulk earthworks for heap leach pads, sediment control and emergency ponds, perimeter embankments, decant facilities and geosynthetic clay liner installation.

03

Tailings conditioning

Soil and material conditioning to client methodology at million cubic metre scale, windrow management and periodic load out of conditioned stockpiles.

04

Access and haul roads

Construction, sheeting and ongoing maintenance of mine access road networks, including drainage channels and culverts for all weather access.

05

Remote site establishment

Self sufficient fly camps, satellite communications, on-site mechanical support, bore roads and headworks, working under the Mining Act and regulations.

06

Asset and labour management

Full management of assets, human resources and consumables for site services contracts, including facilities, light vehicles, freight and waste.

Recent work

Mining Services projects

Solomon Mine tailings conditioning
MiningNovember 2024

Fortescue

Soil conditioning at million cubic metre scale for the new Brad Tailings Storage Facility walls in the Kings Valley mining area.

Binduli heap leach pads and ponds
MiningJune 2024

Norton Gold Fields

Bulk earthworks for ten additional heap leach pads plus sediment control and emergency ponds on a six month contract.

ABRA mine site establishment, TSF and aerodrome
MiningJune 2024

Abra Mining

Remote site establishment with a self sufficient fly camp, followed by construction of the Tailings Storage Facility and aerodrome.

Golden Grove mine site services
MiningJune 2024

29Metals

A full mine site services contract covering ROM pad operations 24 hours a day, 365 days a year, paste plant services and site maintenance.

Need a mining contractor in regional WA?

Tell us the scope, the site and the window. We will come back with a programme and a price.