Mining Services

ABRA mine site establishment, TSF and aerodrome

Remote site establishment with a self sufficient fly camp, followed by construction of the Tailings Storage Facility and aerodrome.

Client
Abra Mining
Capability
Mining Services
Location
Remote Western Australia
Completed
Ongoing

The scope of the project first phase was to undertake initial bulk earthworks, construct bore road and access road, and provide a fly camp for construction of permanent camp bulk earthworks.

Phase one works included

  • Operating in a remote location
  • Provision of self-sufficient camp accommodation and satellite communications
  • Provision of on-site mechanical support
  • Clear access track and roads into permanent camp and process plant area
  • Strip topsoil and stockpile for future use
  • Excavate from cut areas, haul to fill areas
  • Excavate from borrow areas, haul to fill areas
  • Use of marginal materials for access road construction
  • Head works to obtain water from water bores on site
  • Working under the Mining Act and regulations

Tailings Storage Facility and aerodrome

After completion of the permanent camp and access roads, we were contracted to construct the Tailings Storage Facility and the Aerodrome.

  • Site preparation: clearing, grubbing, and stripping of topsoil
  • Earthworks and pavements including foundation preparation and cut to fill from within graded runway and taxiway
  • Excavation of drains including shape to design
  • Import fill for runway: spread, condition and compact
  • Trim and proof roll to finished level graded runway, clearway, RESA and taxiway strips and drainage channels
  • Hard rock excavation
  • Supply and install windsock and aerodrome aids
  • Supply and install 1.5m high perimeter fencing including 6m opening double gates
  • Bulk earthworks to construct the perimeter embankments and decant facilities and installation of the geosynthetic clay liner (GCL) for the Tailings Storage Facility
This contract is ongoing with regular maintenance of the mine's access road network.

More mining work

Related projects

Solomon Mine tailings conditioning
MiningNovember 2024

Fortescue

Soil conditioning at million cubic metre scale for the new Brad Tailings Storage Facility walls in the Kings Valley mining area.

Binduli heap leach pads and ponds
MiningJune 2024

Norton Gold Fields

Bulk earthworks for ten additional heap leach pads plus sediment control and emergency ponds on a six month contract.

Golden Grove mine site services
MiningJune 2024

29Metals

A full mine site services contract covering ROM pad operations 24 hours a day, 365 days a year, paste plant services and site maintenance.

Have something similar to price?

Send through the scope and we will get back to you with a programme and a price.